Caldra
Big Bluestem Solar

INV-01-S06

Trina TSM-540 · 0.03 MW · 2021
gold
87.4
gold
MCS
as of 5/10/2026
MCS contribution87.4 total
Repair Compliance
weight 35%·raw 89.2·+31.2
% Playbook actions completed within severity window · 4-q rolling — your single largest controllable lever
Inspection
weight 30%·raw 87.9·+26.4
Blade · gearbox · nacelle vs severity-graded defect taxonomy · current physical state
Continuous Monitoring
weight 20%·raw 86.3·+17.3
Acoustic / drivetrain CMS · early warning between scheduled inspections
Data Hygiene
weight 15%·raw 83.9·+12.6
Work-order structure · SCADA availability · photo compliance — gates the reliability of every other component
Critical Open
0
CAT 4 + 5
Material Open
0
CAT 3
In Progress
0
Status
operating
Score · 12 months