Caldra

How MCS works

Four signals, one number. Like a credit score for your fleet.

82.0
gold
Sample fleet
illustrative
Tier ladder
platinum
MCS 90+
-22%
gold
MCS 80–89
-16%
reached
silver
MCS 70–79
-8%
reached
standard
MCS 60–69
baseline
reached
MCS contribution82.1 total
Repair Compliance
weight 35%·raw 84.0·+29.4
% Playbook actions completed within severity window · 4-q rolling — your single largest controllable lever
Inspection
weight 30%·raw 81.0·+24.3
Blade · gearbox · nacelle vs severity-graded defect taxonomy · current physical state
Continuous Monitoring
weight 20%·raw 76.0·+15.2
Acoustic / drivetrain CMS · early warning between scheduled inspections
Data Hygiene
weight 15%·raw 88.0·+13.2
Work-order structure · SCADA availability · photo compliance — gates the reliability of every other component
Repair Compliance
≈ FICO "Payment History"
35%
weight

Closing flagged actions inside the cure window. Biggest controllable lever.

CAT 5 closed inside 14 dayshighest
CAT 4 closed inside 30 dayshigh
CAT 3 closed inside 60 dayshigh
CAT 2 closed inside 120 daysmoderate
Approved alternative pathwaycompliant
Force-majeure windowno penalty
Cure window missed1.5%/day haircut
Two breaches in 12 months+15% premium
Inspection
≈ FICO "Amounts Owed"
30%
weight

Current physical state — drone, IBIS, and aerial scans turned into the CAT 1–5 defect taxonomy.

Blade defects CAT 1–5higher CAT = lower score
Gearbox & main bearingalarms drop score
Solar string anomaliesstring-by-string
Recent full inspectionstale lowers score
Caldra-certified vendorself-inspected halves weight
Continuous Monitoring
≈ FICO "Credit Mix"
20%
weight

Always-on signal between inspections — acoustic, drivetrain, SCADA.

Sensoria acoustic activeGold tier req
ONYX drivetrain streamingdepth
Clir SCADA up to datevalidates SCADA
Acoustic propagation > threshauto-flags Sev 2
Coverage gap > 7 daysdirect penalty
Data Hygiene
≈ FICO "Length of History"
15%
weight

Data quality floor. Without clean inputs the others can't be measured.

Work-order schema correctopen / repair / verified
SCADA availability ≥ 98%30-day rolling
Repair photos < 72hSev 1 + 2 only
Vendor feed paused > 48hfix in window
Unreconciled work orderspost-completion gate
Tier impact
uninsurable
0–59
decline
standard
60–69
baseline
silver
70–79
-8%
gold
80–89
-16%
platinum
90+
-22%