All sitesgold
Mesa Verde Wind
TX · 198 MW · GE · 2014
83.1
gold
Site MCS
capacity-weighted
MCS contribution83.1 total
Repair Compliance
weight 35%·raw 79.7·+27.9
% Playbook actions completed within severity window · 4-q rolling — your single largest controllable lever
Inspection
weight 30%·raw 84.4·+25.3
Blade · gearbox · nacelle vs severity-graded defect taxonomy · current physical state
Continuous Monitoring
weight 20%·raw 86.5·+17.3
Acoustic / drivetrain CMS · early warning between scheduled inspections
Data Hygiene
weight 15%·raw 84.0·+12.6
Work-order structure · SCADA availability · photo compliance — gates the reliability of every other component
Above Floor
88
of 88 assets
Critical Open
2
CAT 4 + 5
In Progress
1
Completed (90d)
2
Turbines
click to drill in
81838382818384828384848382838482848585848482818383858384858483828284838383838483848284828183838484848385838284828483848384848482828383828584838482818282828382828383858582838482
uninsurable<60standard60–69silver70–79gold80–89platinum90+
Score · 12 months
Playbook · this site
T-02
leading edge erosion cat3
Force majeureT-71drivetrain major alarm
16d / 60dT-71exposed fibres
17d / 30dT-62leading edge erosion cat3
20d / 60dT-74gearbox oil critical
22d / 30dT-19leading edge erosion cat3
23d / 60dT-31blade root corrosion
23d / 60dT-51drivetrain major alarm
CompletedT-50coating breakdown
36d / 60dT-64string underperformance
CompletedT-16coating wear
99d / 120dT-21string underperformance
102d / 120d