All sitesplatinum
Lone Coyote Ridge
OK · 150 MW · Vestas · 2017
94.3
platinum
Site MCS
capacity-weighted
MCS contribution94.3 total
Repair Compliance
weight 35%·raw 93.8·+32.8
% Playbook actions completed within severity window · 4-q rolling — your single largest controllable lever
Inspection
weight 30%·raw 94.7·+28.4
Blade · gearbox · nacelle vs severity-graded defect taxonomy · current physical state
Continuous Monitoring
weight 20%·raw 97.6·+19.5
Acoustic / drivetrain CMS · early warning between scheduled inspections
Data Hygiene
weight 15%·raw 90.0·+13.5
Work-order structure · SCADA availability · photo compliance — gates the reliability of every other component
Above Floor
60
of 60 assets
Critical Open
2
CAT 4 + 5
In Progress
0
Completed (90d)
1
Turbines
click to drill in
949494949493949694939694969493949692959594949394959394959593949494949396959496959395949596949494959492969695949494979494
uninsurable<60standard60–69silver70–79gold80–89platinum90+
Score · 12 months